Get quotes
Home / Services / Mezzanine floors

Storage · office · retail

Mezzanine floor installers across the UK

A mezzanine adds floor space inside the building you already have, often for far less than moving. We match you with specialists who design the floor, handle Building Regulations and install it complete with stairs, handrails and any fire protection.

A 50 m² storage floor is roughly £8,000–£12,000. See the cost guide.

  • Up to three quotes from vetted specialists
  • Insurance and accreditations checked
  • Free, with no obligation

Get mezzanine floors quotes

Takes about two minutes. Free and no obligation.

What's included

  • Structural design and load calculations
  • Building Regulations applications
  • Storage, office, production and retail mezzanines
  • Fire protection to columns, beams and ceilings where required
  • Staircases, handrails, balustrades and pallet gates
  • Partitions, ceilings, lighting and floor finishes on the new level

What affects the price

  • Floor area and the load it needs to carry
  • Use: storage floors are cheaper than office floors
  • Fire protection, which office and most working floors need
  • Number of staircases and pallet gates
  • Fit-out on top: partitions, ceilings, lighting, heating

Rules and safety

Most mezzanines need Building Regulations approval covering structure, fire and means of escape. Office and working mezzanines must be fire rated; some smaller storage floors may not need to be. Planning permission is sometimes needed, so check with your council.

Budgeting? Our mezzanine floors cost guide has published UK price ranges with sources.

Questions

Mezzanine floors: common questions

Do I need Building Regulations approval for a mezzanine?

Almost always. Most installers make the application for you as part of the job.

Does a mezzanine need fire protection?

Office, production and packing mezzanines need it. Some storage mezzanines below certain size limits may not. Your installer will confirm based on the layout.

How long does it take to install?

After design and approval, many mezzanines are installed in one to two weeks, depending on size.