Advice
Plain-English guides to the rules and decisions behind a commercial fit-out.
Cat A vs Cat B fit-out: what is the difference?
Cat A is the basic finish a landlord provides so space can be let. Cat B is the fit-out a tenant adds to make it their own. Knowing which is which tells you what you are paying for.
Do you need Building Regulations approval for a mezzanine?
Yes, in almost every case. A mezzanine is new floor structure, so Building Regulations apply. Planning permission is a separate question and is needed less often.
How to choose a commercial fit-out contractor
The cheapest quote is rarely the cheapest job. A few checks before you appoint anyone will save you from the common problems.
End-of-lease dilapidations: a guide for tenants
Dilapidations are the repairs and reinstatement a commercial tenant owes the landlord at the end of a lease. Deal with them early and you keep control of the cost.
Do you need an asbestos survey before a refurbishment?
If the building was built before 2000 and the work will disturb its fabric, yes. A refurbishment and demolition survey must be done before work starts.