Get quotes
Home / Services / Air conditioning and ventilation

Split systems · VRF · ventilation

Air conditioning and ventilation contractors across the UK

New layouts change how air moves round a building. We match you with air conditioning and ventilation contractors who design, install and maintain systems.

  • Quotes from vetted specialists
  • Insurance and accreditations checked
  • Free, with no obligation
An air conditioning outdoor unit fixed to a wall
Illustrative photo

Get air conditioning and ventilation quotes

Free · No obligation · Vetted installers only

What do you need?
Tick everything you need

Ceilings and walls

Floors

Power, data and air

Kitchens and washrooms

Finishes and joinery

Fire safety

Shopfronts and signs

Warehouse

Clearing out

A few details
Where should the quotes go?

Options

Types of air conditioning and ventilation

Split systems

One indoor unit to one outdoor unit. Good for single rooms.

Multi-split

Several indoor units on one outdoor unit.

VRF or VRV

Larger systems that heat and cool different areas at once.

Ventilation

Fresh air, heat recovery and extraction.

What is included

  • Split and multi-split air conditioning
  • VRF and VRV systems for larger floors
  • Fresh air ventilation and heat recovery
  • Kitchen and washroom extraction
  • Relocating units and grilles to suit new rooms
  • Servicing and maintenance

What affects the price

  • Size of the space and number of rooms
  • Heat from people, equipment and glazing
  • Pipe and duct routes, and where outdoor units can go
  • Whether the existing system can be adapted
  • Controls, and landlord or planning limits on outdoor units

Process

How the job runs

  1. Survey and heat load calculation

  2. Design and consents

  3. Install pipework, units and controls

  4. Commission and hand over

How long? A single split system is often fitted in a day or two. Larger systems take longer.

Questions to ask an installer

  • Are your engineers F-gas certified?
  • Have you calculated the heat load?
  • Where will the outdoor units go?
  • Is commissioning and a service visit included?

Rules and safety

Anyone handling refrigerant must hold F-gas certification, and the company must be F-gas registered. Systems above set refrigerant charges need regular leak checks. Air conditioning with a combined output over 12 kW needs an energy inspection, known as TM44, every five years. Fresh air rates are set by Part F of the Building Regulations.

Ready to price your air conditioning and ventilation?

Two minutes now gets you quotes from checked specialists.

Get quotes

Questions

Air conditioning and ventilation: common questions

Does a new meeting room need its own unit?

Often, yes. Closing off a room cuts it off from the open-plan system, so it needs its own cooling and fresh air.

Do outdoor units need permission?

Sometimes planning permission, and usually landlord consent. Check both before ordering.

Can the existing system be reused?

Often it can be adapted. A survey will show whether it has the capacity and whether it uses a refrigerant that is being phased out.

Get free quotes