Surveys · removal · encapsulation
Asbestos surveys and removal contractors in Wales
Any building put up before 2000 can contain asbestos, and fit-out work is when it gets disturbed. We match you with asbestos surveyors and removal contractors so it is found and dealt with before the other trades start.
- Matched by hand to a checked local expert
- Insurance and company checked
- Free, with no obligation

Options
Types of asbestos surveys and removal
Refurbishment survey
An intrusive survey of the areas the work will disturb.
Management survey
Finds materials that could be disturbed in normal use.
Licensed removal
Higher-risk materials removed in controlled enclosures.
Encapsulation
Sealing material that is safe to leave in place.
What is included
- Refurbishment and demolition surveys
- Management surveys and asbestos registers
- Sampling and lab analysis
- Licensed removal of higher-risk materials
- Non-licensed and notifiable removal
- Encapsulation, air testing and clearance certificates
What affects the price
- Age and size of the building
- How much of it the work will disturb
- Type and condition of any asbestos found
- Whether the work needs a licensed contractor
- Access, enclosures and waste disposal
Process
How the job runs
Survey and samples
Report and plan of work
Removal or encapsulation
Air test and clearance certificate
How long? Licensed work needs notice to the HSE before it starts, so build it into the programme.
Questions to ask an installer
- Is the survey a refurbishment and demolition survey?
- Are you licensed by the HSE for this work?
- Who does the air testing and clearance?
- Where will the waste go, and will I get the consignment notes?
Rules and safety
The Control of Asbestos Regulations 2012 apply to all non-domestic buildings. Before refurbishment work, a refurbishment and demolition survey of the areas affected is normally needed, and the work should not start until any asbestos found has been dealt with. Most work with higher-risk materials, such as sprayed coatings and insulating board, must be done by a contractor licensed by the HSE, and licensed work has to be notified to the HSE in advance.
Ready to price your asbestos surveys and removal?
Two minutes now gets you quotes from checked specialists.
Questions
Asbestos surveys and removal: common questions
Do I need a survey before a fit-out?
If the building was put up before 2000 and the work will disturb its fabric, yes. A refurbishment survey of the areas being worked on is the normal starting point.
How long does a survey take?
The site visit for a small unit can be done in a day. Lab results and the written report follow afterwards.
Does all asbestos have to be removed?
No. Material in good condition that the work will not disturb can often be left in place and managed. Material in the way of the work must be dealt with first.
How we look after you
Every job matched by hand to a checked local expert.
Run from South Wales by someone who has worked on the tools in commercial fit-out.
Read by a person
We read every brief ourselves and choose who gets it. No algorithm, no auction.
Checked before they get your job
Insurance and company status checked, plus a Google rating of 4 or more or references we contact.
You know who is calling
We email you the names of the installers we have passed your details to.
We follow up
We ask how the job went. Installers who let customers down are removed.