Get quotes
Home / Services / Solar panels and EV charging

Solar PV · batteries · EV chargers

Solar panels and EV charging contractors in Wales

Solar panels cut energy bills and EV chargers are fast becoming expected at work. We match you with installers who survey the roof and supply, fit and certify the system.

  • Matched by hand to a checked local expert
  • Insurance and company checked
  • Free, with no obligation
Rows of solar panels on a roof
Illustrative photo
Get solar panels and ev charging quotes

What do you need?

Which trades do you need?

Tick as many as you need.

Ceilings and walls

Floors and tiling

Building and structure

Power, data and AV

Heating, cooling and energy

Kitchens and washrooms

Finishes and joinery

Fire safety

Doors, windows and shopfronts

Warehouse and industrial

Strip-out and asbestos

Design and handover

What kind of building is it?

Roughly how big is it?

When do you want it done?

Where is the building?

The postcode tells us which installers cover it.

Do you have drawings or a layout?

Who should the installers contact?

Anything else installers should know?

Optional. Access, opening hours, deadlines, anything unusual.

Your brief

Check it over. Tap any line to change it.

When you send it, we read your brief and pass it only to checked installers who do that work and cover your postcode. They contact you to visit and quote. No obligation.

Options

Types of solar panels and ev charging

Rooftop solar

Panels that cut daytime energy bills.

Battery storage

Stores solar power for later.

EV chargers

Workplace and customer charge points.

Monitoring

Track generation and use.

What is included

  • Roof-mounted solar PV systems
  • Battery storage
  • Workplace and customer EV charge points
  • Electrical upgrades for charging
  • Monitoring and maintenance
  • Grid connection applications

What affects the price

  • Roof size, condition and direction
  • How much power the building uses
  • Number of chargers and their speed
  • Capacity of the electrical supply
  • Grants and financing

Process

How the job runs

  1. Survey and design

  2. Approvals and grid application

  3. Install

  4. Test, certify and hand over

How long? Installation is quick. Network operator approval for larger systems can take longer.

Questions to ask an installer

  • Are you MCS certified?
  • Who handles the network operator application?
  • What generation do you expect?
  • What warranty and monitoring are included?

Rules and safety

Solar installers should be MCS certified, which you need to be paid for power exported to the grid. Larger systems need approval from the local electricity network operator before they connect. EV charge points must be installed to the wiring regulations, BS 7671. Check the roof can take the weight, and whether planning permission is needed, before installation.

Ready to price your solar panels and ev charging?

Two minutes now gets you quotes from checked specialists.

Get quotes

Questions

Solar panels and EV charging: common questions

Will our roof take solar panels?

Most commercial roofs can, but a survey checks the structure, condition and direction first.

Are there grants for EV chargers?

Schemes change, so ask the installer what is available when you get your quote.

How long does installation take?

Small systems take a few days. Larger systems depend on approval from the network operator.

How we look after you

Every job matched by hand to a checked local expert.

Run from South Wales by someone who has worked on the tools in commercial fit-out.

Read by a person

We read every brief ourselves and choose who gets it. No algorithm, no auction.

Checked before they get your job

Insurance and company status checked, plus a Google rating of 4 or more or references we contact.

You know who is calling

We email you the names of the installers we have passed your details to.

We follow up

We ask how the job went. Installers who let customers down are removed.

Get free quotes